The existing west wing of the Zollikerberg Hospital no longer meets the current requirements of a hospital building. It is to be replaced by a new Minergie-standard building on the same site. The four-storey replacement building with its predestined location facing the park contains three wards and a therapy floor with a therapy bath. All wards are generously designed and have a balcony with a view to the garden.

2010 - 2011

New construction of the west wing:
Three wards, one therapy floor with therapy bathroom

Client:
Zollikerberg Hospital

Planning phases:
Planning and construction of new building

Floor area:
8203m2 (SIA 416)

Building volume:
29822m3 (SIA 416)

Overall management:
Silvia Gmür Reto Gmür Architects

Planning team / ARGE:
Silvia Gmür Reto Gmür Architects, Basel
Eicher + Pauli, Berne
Walter Dietsche Baumanagement AG, Chur

Project lead:
Philipp Müller

Collaboration:
André Bateira, Apppien Battistini, Katja Brunella, Dario Cadoni, Fabian Früh, Judith Lenzen

Photos:
Hélène Binet

Situation
Situation
Ground floor
Ground floor
1st and 2nd floor
1st and 2nd floor
3rd floor
3rd floor
Facade north
Facade north
Facade south
Facade south
Cross section
Cross section
Facade north © Hélène Binet
Facade north © Hélène Binet
Facade north © Hélène Binet
Facade north © Hélène Binet
Facade north © Hélène Binet
Facade north © Hélène Binet
Facade south © Hélène Binet
Facade south © Hélène Binet
Cafeteria © Hélène Binet
Cafeteria © Hélène Binet
Therapy bath © Hélène Binet
Therapy bath © Hélène Binet
Therapy bath © Hélène Binet
Therapy bath © Hélène Binet
Therapy centre ground floor © Hélène Binet
Therapy centre ground floor © Hélène Binet
Therapy centre ground floor © Hélène Binet
Therapy centre ground floor © Hélène Binet
Ward © Hélène Binet
Ward © Hélène Binet
Patient room © Hélène Binet
Patient room © Hélène Binet
Patient room © Hélène Binet
Patient room © Hélène Binet